Track record
Projects delivered
Vessels returned to service, port infrastructure repaired, channels verified and ground conditions established. Each project sets out what the client needed, what we did, and what the outcome was.
TASHICORehabilitation of MT Sangara
Comprehensive multi-discipline overhaul returning the fuel tanker MT Sangara to operational service.
Bandwidth and Cloud Service GroupPontoon Rehabilitation, Kigoma Terminal Port
In-place structural and flotation rehabilitation of a loading pontoon at Kigoma Terminal Port.
Test Client EditStructural Arc Welding, MV Musumba
Structural arc welding to the starboard side as part of MV Musumba's rehabilitation programme.
TASHICOPainting and Protective Coating, MT Sangara
Full protective marine coating system applied to MT Sangara following structural rehabilitation.
JKT BulomboraRehabilitation of Fishing Boats, JKT Bulombora
Restoration, repair and upgrade of a fleet of small fishing vessels to seaworthy, compliant condition.
TASHICOEngine Room Inspection, MT Sangara
Comprehensive engine room inspection assessing propulsion and power systems for reliability and remaining life.

Geotechnical Investigation, Bunda–Ukerewe
Subsurface investigation across a wetland corridor to characterise ground conditions ahead of infrastructure design.

Post-Dredge Survey, Mwanza North Port
Bathymetric verification of achieved depths following dredging at Mwanza North Port.
Your project could be next
Send us the scope, the vessel or the site. We will tell you what it needs and what it costs.
