Chipping, Cup Brushing and Painting, GBP Marine
Surface preparation and protective coating work for GBP Marine at Tanga.
Kookje Engineering Company Limited engaged Aquarian to prepare and recoat GBP Marine's hull and structure. The scope covered mechanical surface preparation — chipping and cup brushing to remove corrosion and failed coating — ahead of a full protective paint system, extending the vessel's coating life and protecting the steel beneath. The job took the crew to Tanga on Tanzania's coast, alongside the inland lake work that makes up most of Aquarian's programme.
Scope delivered
- Chipping to remove rust, scale and failed coating
- Cup brushing for mechanical surface preparation
- Surface cleanliness verification ahead of coating
- Marine protective coating system application
More of our work

Rehabilitation of MT Sangara
Comprehensive rehabilitation of the fuel tanker MT Sangara — steelwork, painting and machinery restoration under one contract.

Pontoon Rehabilitation, Kigoma Terminal Port
In-place structural and flotation rehabilitation of a loading pontoon at Kigoma Terminal Port.

Rehabilitation of MV Msumba
Rehabilitation of MV Msumba, including structural arc welding to the starboard hull.