
All projects
Rehabilitation of MT Sangara
Comprehensive multi-discipline overhaul returning the fuel tanker MT Sangara to operational service.
MT Sangara required a comprehensive overhaul to restore operational efficiency and bring the vessel back to modern maritime standards. Aquarian delivered the rehabilitation as a single multi-discipline contract covering structural, mechanical and coatings work.
Scope delivered
- Structural survey and defect assessment across hull, deck and superstructure
- Hull plate renewal and structural steel repair
- Engine room inspection and machinery overhaul
- Piping and systems repair
- Complete surface preparation and marine coating system
- Sea trial support and documented handover
Outcome
The vessel returned to operational service on Lake Tanganyika.
More of our work

Pontoon Rehabilitation, Kigoma Terminal Port
In-place structural and flotation rehabilitation of a loading pontoon at Kigoma Terminal Port.

Structural Arc Welding, MV Musumba
Structural arc welding to the starboard side as part of MV Musumba's rehabilitation programme.

Painting and Protective Coating, MT Sangara
Full protective marine coating system applied to MT Sangara following structural rehabilitation.
