
All projects
Pontoon Rehabilitation, Kigoma Terminal Port
In-place structural and flotation rehabilitation of a loading pontoon at Kigoma Terminal Port.
Loading and unloading operations at Kigoma Terminal Port depended on a pontoon whose structural condition and flotation had deteriorated. Aquarian rehabilitated the structure in place.
Scope delivered
- Structural steel repair and reinforcement
- Reinforcement of flotation mechanisms and buoyancy chamber integrity
- Surface preparation and repainting
- Deck fittings and mooring arrangement repair
Outcome
The pontoon returned to stable, secure and fully functional service for loading and unloading operations.
More of our work

Rehabilitation of MT Sangara
Comprehensive rehabilitation of the fuel tanker MT Sangara — steelwork, painting and machinery restoration under one contract.

Rehabilitation of MV Msumba
Rehabilitation of MV Msumba, including structural arc welding to the starboard hull.

Rehabilitation of MV Bulombora and Fishing Fleet
Restoration, repair and upgrade of MV Bulombora and six fishing vessels to seaworthy, compliant condition.
