
All projects
Pontoon Rehabilitation, Kigoma Terminal Port
In-place structural and flotation rehabilitation of a loading pontoon at Kigoma Terminal Port.
Loading and unloading operations at Kigoma Terminal Port depended on a pontoon whose structural condition and flotation had deteriorated. Aquarian rehabilitated the structure in place.
Scope delivered
- Structural steel repair and reinforcement
- Reinforcement of flotation mechanisms and buoyancy chamber integrity
- Surface preparation and repainting
- Deck fittings and mooring arrangement repair
Outcome
The pontoon returned to stable, secure and fully functional service for loading and unloading operations.
More of our work

Rehabilitation of MT Sangara
Comprehensive multi-discipline overhaul returning the fuel tanker MT Sangara to operational service.

Structural Arc Welding, MV Musumba
Structural arc welding to the starboard side as part of MV Musumba's rehabilitation programme.

Painting and Protective Coating, MT Sangara
Full protective marine coating system applied to MT Sangara following structural rehabilitation.
