
All projects
Rehabilitation of MV Butiama
Ballast tank partitioning to improve MV Butiama's operating stability.
MV Butiama's ballast arrangement was limiting the vessel's stability margins in service. Aquarian redesigned and rebuilt the ballast tank layout, partitioning the space to give the vessel finer control over trim and stability across its operating conditions.
Scope delivered
- Condition assessment of the existing ballast tank arrangement
- Structural design of the new tank partitioning
- Steel fabrication and installation of partition bulkheads
- Welding to marine structural standard
- Tank testing for watertight integrity
- Stability verification following the modification
Outcome
Improved stability margins across the vessel's operating conditions.
More of our work

Rehabilitation of MT Sangara
Comprehensive rehabilitation of the fuel tanker MT Sangara — steelwork, painting and machinery restoration under one contract.

Pontoon Rehabilitation, Kigoma Terminal Port
In-place structural and flotation rehabilitation of a loading pontoon at Kigoma Terminal Port.

Rehabilitation of MV Msumba
Rehabilitation of MV Msumba, including structural arc welding to the starboard hull.
