
Post-Dredge Survey, Mwanza North Port
Bathymetric verification of achieved depths following dredging at Mwanza North Port.
Following dredging at Mwanza North Port, Aquarian conducted a post-dredge survey to verify achieved depths and assess the effectiveness of the dredging works. The survey confirmed whether the port's navigation channels met the required standard for safe vessel access and operation, providing the port with the verified data needed to sign off the dredging contract and to publish safe operating depths.
Scope delivered
- Bathymetric survey of dredged areas and navigation channels
- Comparison of achieved depths against design specification
- Identification of areas requiring further dredging
- Survey reporting with charts and depth data
More of our work

Rehabilitation of MT Sangara
Comprehensive multi-discipline overhaul returning the fuel tanker MT Sangara to operational service.

Pontoon Rehabilitation, Kigoma Terminal Port
In-place structural and flotation rehabilitation of a loading pontoon at Kigoma Terminal Port.

Structural Arc Welding, MV Musumba
Structural arc welding to the starboard side as part of MV Musumba's rehabilitation programme.
